1.When every work finishs, the machine shall be clean.
2.The abration of board in the cleaning room and the orientor,seperator of the blast machine shall be checked regularly, replace them with new ones when the abration is large.
3.Add lubricant regularly with stipulation and often check the flexibility of the machine. the lubricant spots are showed on picture 4 and table 2.
4.Check the transmission parts regularly, and clean the parts, and replace the parts of heavy abration.
5.The power shall be cut off when the machine is inspection and maintainness, to avoid accidents.
6.Boards in the cleaning room shall be replaced regularly according to abrasion. the gap between boards shall be less 1.5mm when replace them according to example 5: |